About the Client
A health benefits company operating in the United States serves more than 11.9 million customers. Its product portfolio includes a diversified mix of managed care products, including Preferred Provider Organizations (PPOs), Health Maintenance Organizations (HMOs) and Point-Of-Service (POS) plans. The company also offers several specialty products, including group life and disability insurance benefits, pharmacy benefit management and dental, vision and behavioral health benefits services.
Business Need
The company had a significantly large database, which was consolidated from various systems using an ETL (Extract, Transform, Load) tool. This tool would mine data from a database and then transform and store the mined data in a data warehouse. The company wanted to outsource the reengineering of the data warehouse and partnered with Infosys to build a modular, scalable architecture so that the processing batch time could be reduced considerably.
After the success of this engagement, Infosys handled the maintenance of the data warehouse, thus freeing the client's internal resources to tackle other pressing tasks and lending flexibility in operations.
Challenges and Requirements
The task of taking a huge database and reshaping it to improve efficiency is a difficult undertaking. Infosys found that:
Infosys' Role
Since time was as critical as cost savings, Infosys used its Global Delivery Model and its team of nine personnel completed the project in 16 months. The initial task concerned a detailed study of the existing ETL model to identify the bottlenecks. Once this was completed, the Infosys team determined areas of improvement. These changes were implemented in a short duration, resulting in an ETL that processed information at a faster pace.
Once the speed factor had been satisfactorily handled, Infosys had to ensure future maintainability of the ETL. This was done by making the ETL concurrent and scalable, so that the client could confidently ramp up the storage and processing capabilities of the data warehouse at a later date, if required.
The final task before Infosys was maintaining the data warehouse so that the client's key personnel could handle other tasks. This is an ongoing task and is being achieved to the full satisfaction of the client.
Benefits
The new ETL delivered many benefits to the client including:
Sourcing at your fingertips: